BoM Trace
Version: 150113
Printed Report Title:Â Â BOM Consumed Items Trace
Report Summary
For a given produced item, this report will show all of the components used to make it and the cost for each.
Default Location In OBeer
Base Module:Â Production > Production Reports > Orchestrated Reports
Reports Module:Â Reports > Production > Orchestrated Reports
*These are the standard default locations. Your locations may be different.
Â
Typically Used by
Production Managers and Planners would review that all the correct components and quantities are on a given Bill of Materials
Key Requirements
none
Parameter Entry Options
Required:
Select Item to TraceÂ
Enter Qty to produce (in multiples of the standard BOM quantity)
Optional:
Last Price Paid (Blank) or Choose Price list
Parameter Entry Image
Â
Report Sample Image
Â